I have the fuel lines 95% done. Still have to mount them. They run along the top of the frame rail. When they come into the engine bay they are in the fender.

Phil came over. This is how things looked when he left. we dont think this D20 has ever been apart. We had to fight to get it apart.. And it shows too. Many worn bearings. So now I got to get new bearings.


Radiator mock up. The bottom of the core support is tweeked. It pushes the radiator towards the fan by almost an inch.

got the fuel lines ran to the TB. Heat wrapped the supply line. Hooked up and tested the BC throttle cable. Mounted the top side of the BC kickdown cable.











